Residential rewire project

1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11

Typically, not all the soil fits into the excavation
Typically, not all the soil fits into the excavation. Soil is mounded over the excavation, which allows it to settle into the trench, reducing repair required when area is restored.