Residential rewire project

1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11

Crew uses walk-behind trencher
Crew uses walk-behind trencher. This type of equipment may be used when soil conditions (high soil-to-rock ratio) allow or when construction area is limited. Heavier equipment is needed for rocky areas.