Village of Cascade Wastewater Treatment Plant


Location

N3191 Bates Rd.
Cascade, Wis.

Operational date

July 2010

Project

Two 100-kilowatt Northwind turbines

Total project cost

Approximately $900,000

Incentive

$150,000 We Energies
$250,000 Focus on Energy

Estimated savings achieved

$32,340

Production Data

Go to Village of Cascade Wastewater Treatment Plant real-time data

Success

The Village of Cascade in Sheboygan County (population 689) installed two 100-kW wind turbines to provide power to its wastewater treatment plant. The project offers affordable services to the community while conveying a progressive example of the benefits of energy independence and the village’s support of the renewable energy movement.

Research on the feasibility of installing a wind energy system at the wastewater treatment facility began in May 2008. A wind site assessment report was completed by a certified wind site assessor with the Focus on Energy program, which determined the site to be a good host for a wind energy system.

The project's two wind turbines were manufactured by Northern Power in Barre, Vermont. The project was justified by the estimated production of the turbines and the grants from Focus on Energy and We Energies. The large amount of electric consumption at the wastewater treatment facility is offset by the electric generated from the wind energy system, which can produce more energy than used by the treatment facility.

The Village of Cascade
The Village of Cascade's 100-kW wind turbines.