May 12, 2011
PSCW issues written order with conditions (PDF 1.7mb)

March 28, 2011
Wisconsin DNR issues air permit (PDF 325k)

Jan. 28, 2011 – Department of Natural Resources issues draft Air Permit, Preliminary Determination and Environmental Assessment. Hearing scheduled for March 1.
Environmental Assessment (PDF 1.1mb)
Preliminary Determination (PDF 340k)
Draft Air Permit(PDF 242k)

Nov. 16, 2010
Control Technology Review for Greenhouse Gas Emissions (PDF 487k)

Oct. 28, 2010
Updated Air Quality Impact Analysis (Appendix E) (PDF 3.3mb)

Oct. 1, 2010
Revised Case-by-Case MACT Analysis for Organics (PDF 63kb)
Revised Control Technology Review for Carbon Monoxide (PDF 265kb)
Revised Permit Application Emissions Tables (PDF 78kb)

Aug. 26, 2010 - site plan reviewed by Rothschild Planning and Zoning Commission and approved by Village Board

Aug. 19, 2010 - variance hearing - requests approved
Presentation to Board of Appeals (PDF 922k)

July 28, 2010 - filed variance request application with Village of Rothschild
Variance Request (PDF 51mb)

June 29, 2010 - filed site plan with Village of Rothschild
Site Plan (PDF 80mb)

March 24, 2010 – filed air permit application with Wisconsin Department of Natural Resources
Air Permit Application(PDF 2.2mb)
Biomass Boiler Control Technology (PDF 1.8mb)
Natural Gas Boiler Control Technology (PDF 700k)
Balance of Plant Control Technology (PDF 264k)
Case-by-Case MACT Analysis (PDF 528k)
Air Quality Impact Analysis (Appendix E) (PDF 2.2mb)
Permit Application Forms (PDF 452k)
Signed Cover Letter (PDF 92k)

March 15, 2010 – filed application with Public Service Commission of Wisconsin
Certificate of Authority Application (PDF 124mb – may take more than 40 seconds to load)



Facility rendering

Click image for enlarged interactive photo of the proposed biomass energy facility.