Primary time-of-use (CP1)

Overview

This rate plan is available to customers with service at approximately 3,810 volts or higher and who own their own transformation equipment.

How it works

On-peak option hours are 8 a.m. to 8 p.m. or 10 a.m. to 10 p.m. The monthly minimum charge is the facilities charge plus either the charge for 300 kilowatts (kW) of billed demand or the minimum demand charge stated in a customer contract, whichever is greater, plus the customer maximum demand charge.

Facilities charge

All voltages: $17.26027 per day

Energy and demand charges

The credit for the sale of the Point Beach Nuclear Power Plant is $0.00968 per kWh.

Primary voltages less than 12,470 volts

 

Base charge

Fuel Cost Adjustment

Transmission Adjustment

On-peak energy (cents per kWh)

7.095

0.00

0.00

Off-peak energy (cents per kWh)

5.053

0.00

0.00

On-peak demand (dollars per kW)

11.054

0.00

0.00

Customer maximum demand (dollars per kW)

1.023

 

 


Primary voltages between 12,470 volts and 138,000 volts

 

Base charge

Fuel Cost Adjustment

Transmission Adjustment

On-peak energy (cents per kWh)

6.985

0.00

0.00

Off-peak energy (cents per kWh)

4.974

0.00

0.00

On-peak demand (dollars per kW)

10.882

0.00

0.00

Customer maximum demand (dollars per kW)

1.007

 

 


Primary voltages greater than 138,000 volts

 

Base charge

Fuel Cost Adjustment

Transmission Adjustment

On-peak energy (cents per kWh)

6.891

0.00

0.00

Off-peak energy (cents per kWh)

4.818

0.00

0.00

On-peak demand (dollars per kW)

10.736

0.00

0.00

Customer maximum demand (dollars per kW)

0.00

 

 


Public Benefits Fee: Non-Taxable Customer Charge

Transmission Level Service through American Transmission Company

ATC owns and operates the transmission system. For Cp1 service at voltages greater or equal to 69-kilovolts, We Energies and ATC work together to develop solutions for new interconnection substations.