This rate plan is available to customers with service at approximately 3,810 volts or higher and who own their own transformation equipment.
On-peak option hours are 8 a.m. to 8 p.m. or 10 a.m. to 10 p.m. The monthly minimum charge is the facilities charge plus either the charge for 300 kilowatts (kW) of billed demand or the minimum demand charge stated in a customer contract, whichever is greater, plus the customer maximum demand charge.
All voltages: $17.26027 per day
The credit for the sale of the Point Beach Nuclear Power Plant is $0.00968 per kWh.
Primary voltages less than 12,470 volts |
|||
Base charge |
Fuel Cost Adjustment |
Transmission Adjustment |
|
On-peak energy (cents per kWh) |
7.095 |
0.00 |
0.00 |
Off-peak energy (cents per kWh) |
5.053 |
0.00 |
0.00 |
On-peak demand (dollars per kW) |
11.054 |
0.00 |
0.00 |
Customer maximum demand (dollars per kW) |
1.023 |
|
|
Primary voltages between 12,470 volts and 138,000 volts |
|||
Base charge |
Fuel Cost Adjustment |
Transmission Adjustment |
|
On-peak energy (cents per kWh) |
6.985 |
0.00 |
0.00 |
Off-peak energy (cents per kWh) |
4.974 |
0.00 |
0.00 |
On-peak demand (dollars per kW) |
10.882 |
0.00 |
0.00 |
Customer maximum demand (dollars per kW) |
1.007 |
|
|
Primary voltages greater than 138,000 volts |
|||
Base charge |
Fuel Cost Adjustment |
Transmission Adjustment |
|
On-peak energy (cents per kWh) |
6.891 |
0.00 |
0.00 |
Off-peak energy (cents per kWh) |
4.818 |
0.00 |
0.00 |
On-peak demand (dollars per kW) |
10.736 |
0.00 |
0.00 |
Customer maximum demand (dollars per kW) |
0.00 |
|
|
Public Benefits Fee: Non-Taxable Customer Charge
Transmission Level Service through American Transmission Company
ATC owns and operates the transmission system. For Cp1 service at voltages greater or equal to 69-kilovolts, We Energies and ATC work together to develop solutions for new interconnection substations.